Multi-Program Changes

<< Click to Display Table of Contents >>

Navigation:  Global Programming >

Multi-Program Changes

Previous pageReturn to chapter overviewNext page

Overlap Protection

1.Open Global Programming and select the Programs tab

2.Click on the check box for feature you would like to adjust

3.Drag the Controller or Program Number column to the gray banner.  This will sort by the category

4.Select the settings you would like to apply to the category, check the appropriate box and enter desired settings.

5.From controller list, select multiple or all controllers to be set. Use the common methods of select multiple items i.e. Shift+mouse clicks or Ctrl+mouse clicks to select or deselect specific items in the list.

6.Click APPLY

 

Percent Adjust

There are some important behavior regarding Percent Adjust that need to be taken into consideration when downloading, uploading programs and also reviewing download programs at the controllers. See Percent Adjust Feature for a detailed explanation.

Water Days

Water Days allows you to set up either a 14 day cycle, 31 day cycle or Skip by Day where you can select the start date and choose how many days to set between each watering day.

Irrigation Program

Allows selected programs to be assigned as either irrigation or non-irrigation programs e.g. lighting or water features.

 

See Also

Global Programming Reference