Scheduling

<< Click to Display Table of Contents >>

Navigation:  AIM and Advanced ET (ISC) > ISC Scheduling > Advanced ET >

Scheduling

Previous pageReturn to chapter overviewNext page

If not scheduled in AIM, Advanced ET stations will be scheduled with respect to the controller and agnostic to the larger system as a whole. Stations will turn on in a similar fashion as conventional programs, turning on in order for the duration of their cycle time and continues to loop through its list of stations until each station has ran for its total runtime. Additionally, the scheduler takes into consideration each stations soak time, the controller’s water window, and the controller’s max GPM.